About This Bathroom Remodeling Project
Service: Bathroom Remodeling
Scope of Work
Materials Used
Favorite Part
Our Challenge
Scope of Work
- Demo’d bathroom
- Moved plumbing and electrical
- Replaced window
- Hung, finished and textured drywall
- Installed shower waterproofing system
- Installed heated floor
- Set and grout floor and wall tile, including an accent strip
- Installed vanity
- Installed plumbing and electrical fixtures
- Painted walls and ceiling
- Installed shower door
Materials Used
- Main tile: better
- Accent tile: better
- Vanity: better
- Plumbing fixtures: better
- Electrical fixtures: better
- Mirror: best
- Accessories: good
Favorite Part
We love the way the separate his/her vanity opened the space up and also added a nice design feature to the space.
Our Challenge
There was a faulty head that required a ton of adjustments and ultimately was just replaced.