About This Remodeling Project
Service: Bathroom Remodeling
Scope of Work
Materials Used
Favorite Part
Our Challenge
Scope of Work
- Met with client to help design 3 new bathrooms, choose materials, and customize bathroom layouts
- Created 3D renderings of proposed bathrooms
- Demo’d bathrooms
- Removed 3 walls
- Moved plumbing and electrical
- Replaced window
- Patched and finished drywall
- Installed shower waterproofing systems
- Installed heated floor
- Set and grout floor and wall tile, including an accent wall, accent strip, and niche
- Installed vanities
- Installed plumbing and electrical fixtures
- Painted walls and ceiling
- Installed shower doors
Materials Used
- Main tile: good
- Accent tile: best
- Vanity: better
- Plumbing fixtures: better
- Electrical fixtures: better
- Mirror: better
- Accessories: good
Favorite Part
The herringbone wall took some time to install, but it was well worth it!
Our Challenge
Covid. We had a couple setbacks due to shipping delays, and had to stop work once when our tile setter got sick, and then again when the clients thought they had caught it…but luckily, they were Covid clear.